Technology Tycoon: From Real Estate Tycoon To Technology Overlord

Chapter 150 Energy Storage Power Station



Forty billion dollars, this number is an astronomical figure no matter where it is placed outside.

Not to mention more than 20 people, it is estimated that ten times more would be impossible to collect, but at this moment Figuera never thought that the fundraising would fail.

After all, in this room are the people who sit in the global wealth pyramid, although their wealth has not been announced to the outside world.

But it doesn't mean that their wealth will be lower than those in the ranking.

"President Figueira has invested 30 billion. Naturally, our Aige family cannot lag behind. We claim to invest 10 billion."

"Three billion!"

"Eight billion!"

"Two billion!"

"Six hundred million!"

"Six and a half billion!"

As expected, as expected by Figuera, the 40 billion was divided up by everyone present in less than fifteen minutes.

Among them, because some people could not get a share, Figuera directly rejected the Iger family's investment request of 10 billion, and finally directly set a maximum standard of 5 billion.

After completing the fund raising, Figuera acted quickly and began to personally contact companies related to battery technology the next day.

Among them, he also specifically contacted the people who funded his campaign and asked them to start lobbying to ban new lithium batteries from entering various countries.

Li Yu naturally never thought that a group of foreign energy giants were really discussing how to kill him and break new lithium battery production technology.

The most important thing is to prepare to ban the export business of new lithium batteries, so that Li Yu's new lithium batteries can only be rampant in China.

Since the news came out that Yangqi Group Aian Automobile officially decided to equip Tiansheng Energy with new lithium batteries and placed an order for 20,000 new lithium battery packs.

Biati, who had been chasing closely behind, was also very nervous, and Wang Fu made a decision directly.

BYD's "Song" is specifically positioned as a low-end new energy SUV model to use new lithium batteries.

Last year, the sales volume of this model was just behind the Aian S, and the prices of both models were in the range of 130,000 to 150,000.

Just one is a sedan model and the other is an SUV model.

Originally, Song was a big hit last year and everyone thought it would be in the top three in terms of sales, but in the end, no one expected that it would only be ranked fifth.

BYAT Group sent people to sign the order contract and promoted that "Song" would be the first domestic model equipped with new lithium batteries.

Suddenly two cars were prepared to be equipped with new lithium batteries, which directly detonated the market, and Tiansheng Energy ushered in a peak of visitors.

Basically, one to three companies come to your door every day and offer customized samples and the like.

"Mr. Li, I have personally investigated for a week as you requested, and I have a clear understanding of the situation of the energy storage power station."

Hua Xue, who had just returned to Pengcheng from Fujian Province, rested for a night and immediately came to Li Yu to report the situation the next day.

The energy storage power station project is a project that Li Yu learned about accidentally.

After his preliminary understanding, he realized that there is still a lot of business to be done in electricity.

Since the current power grid and power stations are ready for use, there is no energy storage equipment.

Normally, power stations can always generate electricity stably, but due to human habits.

There will be several power peaks in the 24 hours a day, which will cause the electricity generated by the power station to be wasted during the valley times.

At peak times, power generation may not be able to meet demand directly due to power problems in power stations.

Therefore, energy storage power stations are needed at this moment. When power consumption is low, energy storage power stations will store the excess electricity.

When the electricity consumption peaks, it will be released to meet the electricity demand.

At present, the most common one is a storage hydropower station. The principle is to build a very large reservoir on a mountain with a height of one or two kilometers.

Several power generation units are installed on the mountainside. Water is pumped to the mountain during low valleys and released to generate electricity during peak power consumption.

Hearing Hua Xue's voice, Li Yu looked up at her and immediately smiled and said, "I'm back! There was no accident!"

"No, everything is normal, and because some departments heard that we wanted to know the information about the energy storage power station, they were very cooperative.

Several of these places have directly extended invitations, saying that if we are determined to enter this industry, we are more than welcome to build there!"

Hua Xue followed Li Yu towards the office reception area, covering her mouth and laughing.

"Oh! It seems like this industry should be very popular with everyone."

Li Yu sat down and immediately started to turn on the kettle and boil water as if he had a memory, and then began to prepare tea.

After finishing this, he turned to look at Hua Xue and said directly:

…Please give me flowers…

"Tell me about it! What is the current gap in the domestic market and what is the normal peak-peak electricity price difference?

How are the domestic energy storage power stations currently operating? Are there any profits every year?"

Hearing Li Yu ask about the details, Hua Xue immediately took out the documents prepared overnight and handed them to Li Yu.

Li Yu waved her hand directly and asked Hua Xue to read it out.

Upon seeing this, Hua Xue directly picked up the document and began to introduce it in detail.

Energy storage power stations, although there are many technologies around the world.

However, only one type of storage hydroelectric power station is currently used in the country.

Hua Xue learned about the Xiantao energy storage hydropower station in Fujian Province.

The total construction cost is 4.4 billion and it has an energy storage capacity of 1.2 million KWH.

0

The energy efficiency conversion ratio of this power station is about 72%, which means that 100 kilowatt hours of electricity can ultimately be converted into 72 kilowatt hours of electricity.

Last year, the other company's revenue was 1.4 billion and its net profit was 192 million.

At present, it seems that there is still some profit, but for some reason, the company's profit is too low.

After Huaxue understands that with a normal conversion ratio of 75%, the annual profit per KWH will be between 250-300.

After listening to Hua Xue's analysis, she suddenly began to think secretly in her heart.

At present, the cost of new lithium batteries is less than 500 yuan per KWH. The most important thing is that the new lithium batteries currently produced by Tiansheng are not the best in terms of performance.

Li Yu can also produce better batteries, which can decay more slowly and charge and discharge faster and safer.

Even after the battery is scrapped, Tiansheng Energy can recycle and refining the metal raw materials to make it again.

Now that Tiansheng Energy's lithium battery recycling department has begun construction, Tiansheng Group has also begun to recycle all lithium batteries externally.

Li Yu still attaches great importance to protecting the environment. Although recycling batteries and re-refining them will reduce profits, Ji Yu just sits down.

Not much else to say, based on the cost of 500 per KWH, if the annual profit of 1KWH of a storage power station is 250-300, it basically means that the cost can be recovered in less than two years.

In the future, it will enter the pure profit industry. If you build a 1 million KWH power station, you can wait for a profit of 250 million every year!


Tip: You can use left, right, A and D keyboard keys to browse between chapters.