Chapter 1206 Liquidated damages of 5
"How about Miss Tao, you are surprised, right? But you don't have to mind too much. I came to you this time to talk about cooperation. I don't mean anything else. Please don't misunderstand me, Miss Tao." Then he congratulated me. Yincheng waved his hand and gave a serious explanation, pretending to be a good person.
"Oh, what good thing can you do if you come to me to talk about cooperation?" Tao Baibai curled her lips, not looking too interested.
But when she said this, Liu Xiaqing was a little unhappy.
After all, He Yincheng was a well-known rich second generation in Kyoto. He thought it was a great joy to have He Yincheng sponsor his company.
But now Tao Baibai's attitude doesn't look like that of treating a boss. It's clearly like treating an enemy.
So he immediately scolded: "Bai Bai, how can you talk to Mr. He like this? This time Mr. He wants to hand over all the self-media advertisements of their He's Trading to you, and the annual advertising fee will be thousands." What's more, if you don't apologize to Young Master He, otherwise Young Master He will blame you, and I won't be able to protect you. "
Tens of millions of dollars in advertising?
I'm dizzy!
This He Yincheng is really willing to spend a lot of money!
Seeing this, Tao Baibai became even more nervous.
After all, it was her union on one side and He Yincheng, whom she hated, on the other, making it difficult for her to make a choice.
But at this time, He Yincheng immediately spoke out to dissuade him: "Hey, Mr. Liu, how can you talk to Miss Tao like this? Miss Tao is a very important person in the field of live broadcasting. This time, our He's Trading can cooperate with Miss Tao. Our He family is lucky in trade, so don’t be so harsh on Miss Tao, otherwise Miss Tao will think I have any bad intentions. "
"Yes, yes, what Young Master He said is true. Listen to Young Master He in everything."
Regarding He Yincheng's attitude, Liu Xiaqing knelt down and licked her for a while, not daring to express any objection.
Then he turned to look at Tao Baibai and said: "Okay Baibai, let's have a drink with Mr. He first. Let's talk about cooperation while drinking. After all, this time Mr. He is going to make you a super female anchor. I thought You will definitely become a first-line anchor in China, you must seize this opportunity."
He built me?
Make a ghost!
Tao Baibai rolled her eyes disdainfully again, not taking Liu Xiaqing's words seriously at all.
However, she didn't want to embarrass Liu Xiaqing, so she could only sit down again and greeted He Yincheng with a glass of red wine: "Mr. He, let me toast you first."
"Mr. He, call him Young Master He!" Liu Xiaqing shouted again unhappily.
What a joke!
The He Yincheng family is a large group with a market value of tens of billions!
Facing such a group heir, he had no time to kneel down and lick him, but Tao Baibai lost his fortune here.
This made him say that the female anchors of this year are too arrogant and will not cause any trouble.
Otherwise, if she had been another female anchor, she would have knelt and licked He Yincheng long ago. How dare she do this?
And...less?
Tao Baibai tried shouting these two words in her heart.
But before she could shout out, she immediately felt a little off.
A person like this is still called Mr. He. He is much better than Cao Feng in Huacheng. I don’t know where He Yincheng got his courage.
In her opinion, only a low-key yet domineering man like Cao Feng can be called a young man.
In front of Cao Feng, people like He Yincheng are just department managers at most.
No matter in terms of wealth, status, temperament, or ability, the two of them cannot be compared at all. There is a huge gap between them.
"Okay, Mr. Liu, don't limit yourself to this, let's have a drink for nothing."
Seeing that Tao Baibai had no intention of speaking, He Yincheng was not in a hurry. He immediately waved his hand to smooth things over and drank the red wine glass in one gulp.
After finishing a glass of wine, he turned the glass upside down to show that he didn't have a drop left.
And he signaled to Tao Baibai: "I'll do it for Baibai, you can do whatever you want."
puff!
What the hell, where does this come from?
Can red wine be drunk in one sip?
Seeing this, Tao Baibai felt that He Yincheng was a rich second generation with no temperament.
It is more appropriate to say that he is a nouveau riche, but he cannot be compared with Cao Feng at all.
But she didn't refuse anything, she just pursed her lips and took a sip of red wine, then sat aside and fell silent.
When Liu Xiaqing saw this, he didn't feel embarrassed, so he had to awkwardly greet Shao Yifu for a drink, and then came to sit next to Tao Baibai.
You Qi saw that everyone had already met each other, so he didn't say anything more and went straight to the point:
"It's all in vain. Not only will Mr. He give you tens of millions of dollars in advertising endorsement fees, but he will also sign you up with a huge sum of money to become the advertising spokesperson of their He's Trading Company. From now on, just listen to Mr. He in everything she asks you to do. If there is a live broadcast, do the live broadcast. If you don’t need to do the live broadcast, take a rest. Everything must be obeyed by Mr. He."
What?
Listen to him?
Tao Baibai was stunned for a moment, then immediately raised her head and retorted: "No, Mr. Liu, my contract is signed with our company, what does it have to do with their He's Trading? Besides, I'm just an anchor, but I haven't wanted to do it yet. The idea of being a spokesperson, I don’t want to do this job.”
"Don't do it?" Liu Xiaqing raised the corner of his mouth and showed an evil smile, "Bai Bai, Bai Bai, you don't want to toast or eat the fine wine, the contract you signed with the company has already signed all your business cooperation agency rights to Company, now you must do whatever business contract the company asks you to do. If you don’t do it, you will breach the contract. "
"Is there such a thing? Why don't I remember it?" Tao Baibai's pretty face was stunned, and her expression quickly became serious.
"You don't believe it? Then look at this."
Without saying a word, Liu Xiaqing immediately took out his mobile phone and took out a photo of Tao Baibai's copy of the old contract.
When he handed the terms of the business activities to Tao Baibai, Tao Baibai's face froze.
There was actually a clause in the business contract, and I hadn't noticed it before.
Isn't this selling all of his business activities to the company and becoming a money-making machine for the company?
Thinking of this, she felt a little annoyed about it.
He just said that he should ask his best friend Li Ruobing to help him take a look. Sure enough, there was something fishy in the contract.
If she had known this was the case, she would not have signed such a contract, and would have really sold herself out.
"How much is the liquidated damages?" Tao Baibai then quickly raised his head and asked with a serious face.
"It's not much. It's only 50 million liquidated damages, which is ten times your annual salary. If you want to breach the contract, just pay the liquidated damages. Otherwise, you must carry out the contract in accordance with the content of this contract and sign a new one formulated by our company for you." contract." Liu Xiaqing stopped pretending this time and said with a straight face.
Fifty...fifty million!
As soon as this number appeared, Tao Baibai's whole body started to tremble.
Not to mention 50 million, now she has no money even if she comes up with 5 million.
NOVEL NEXT