Chapter 261
Chapter 0261: The Construction Team Settles In, Surprised Construction Team!!!
Because Li Yueming’s design drawings are too complicated.
In order to save face, the dream transformation program group hired another hall-level structural engineer.
Even if he didn’t see it, Li Yueming could guess that the director’s complicated mood was actually until now, and Li Yueming had not officially met the director.
But the ‘war’ between the two has long been quietly fought.
There are no surprises.
The hall-level structural engineer obtained Li Yueming’s design drawings and carefully observed and checked them.
The name was soon signed in amazement.
Li Yueming put away the design drawing.
It was already noon, and after Li Yueming had eaten a little, he signaled Wang Zhiqiang to take his construction team to prepare to enter.
By two o’clock in the afternoon, a group of workers had all arrived.
Greeted Wang Zhiqiang.
Li Yueming spoke, “Hello Wang Gong!” ”
Wang Zhiqiang’s posture was lower, “Teacher Li, look up for a long time!” ”
The two pleasantries can be regarded as formal acquaintances.
Li Yueming handed over the official construction design drawings signed to Wang Zhiqiang.
Wang Zhiqiang took it and looked at it for a long time, and finally said: “Don’t hide from you, we can decorate other things on this design drawing, only these lines and pipelines we may not be able to do it!” ”
Seeing Li Yueming staring, he quickly added: “Mr. Li, the design of these lines and pipelines is too complicated, and it is estimated that few construction teams can do it in the entire country!” ”
Li Yueming is also mentally prepared for this.
The overlapping design is more complex, and it is one of the most cutting-edge design methods, and the 273 construction team will not get it normal.
On the contrary, if it can be done, Li Yueming will feel even more strange!
He waved his hand and said, “It’s okay, I’ll find a way to solve this decoration by myself at that time, and you can get the other hard and soft decoration parts, right?” ”
Wang Zhiqiang quickly nodded: “Other designs are no problem!” ”
“I’ve heard many colleagues say that your design drawings are very good, and I didn’t quite believe it at that time…”
“After seeing it with my own eyes, I realized that what my peers said was not wrong at all!”
“Mr. Li, your design drawing is so beautiful, it can be said that it is a work of art, and Wang Zhiqiang praised it from the bottom of his heart.”
To this, Li Yueming smiled and did not respond.
However, this remark did resonate with a group of viewers in the live broadcast room.
“Wang Gong’s words have reached my heart!”
“Mr. Li’s design drawings can indeed be called flawless, and it is not an exaggeration to say that they are works of art!”
“As a construction site dog, when will my drawing skills be as strong as Mr. Li?”
“After watching the previous video, Mr. Li’s hands are like a compass and don’t shake at all!”
“Help, School of Construction Engineering, now the tutors of our school have begun to ask us to watch Mr. Li’s video!”
“At first I was reluctant, but I can’t stop looking at this, what should I do?”
“Every time I look at Mr. Li’s design, I feel very comfortable, which is a simple love and appreciation for the art of design!”
With Li Yueming’s design drawings, Wang Zhiqiang took the workers to visit the construction site again in the afternoon.
As a designer, Li Yueming also explained some of his ideas and design concepts to them in more detail.
After a trip, the respect of a group of workers for Li Yueming directly rose several notches.
Because Li Yueming didn’t see any data during the whole process, no matter what tricky questions it was, it couldn’t stop him.
All the data he can clearly accurate to the last two digits of zero.
You must know that there are at least hundreds of data items in a house.
Li Yueming can accurately find a single piece of data from these hundreds of data through memory.
What a powerful memory is this? It’s so strong that there is no mother!
A group of workers are still talking even after they come out of the house.
After showing them the house, I explained some details.
Li Yueming took the workers to the workshop prepared for them in advance.
Once you’ve settled in, the renovation can officially begin tomorrow morning.
Time flies by.
In the evening, after eating, Li Yueming asked where the largest local building materials market in Suzhou was.
After the renovation officially began.
Building materials also have to be supplied quickly.
For maximum time savings.
When the workers begin to demolish the non-load-bearing walls of the room tomorrow, Li Yueming will have to buy the engineering materials back through this time.
Early the next morning.
After breakfast, Li Yueming took Wang Ye’s special car to the largest local building materials market in Suzhou.
Of course, the main sale here is construction equipment such as water, electricity, hardware tools, etc.
Other items such as furniture and appliances are less common here.
These are the first things you need for a house renovation.
As for furniture and electrical appliances, they are all things that are needed after the hard installation is completed.
At present, Li Yueming only needs to buy hardware equipment for emergencies.
Because the funds are relatively abundant this time.
Li Yueming was not ready to go to the second-hand market.
The things in the second-hand market are cheap, and the quality of the things you buy may be quite good if you recognize the goods.
But after all, those are things that have been in the market for a long time.
The most exaggerated can have about ten years.
If you want to compare with some of the latest modern models, there is definitely no comparison.
Enter the Hardware City.
Li Yueming began to explore some prices in Hardware City one by one.
Because I have this kind of procurement experience in Modu and Hainan.
So this time Li Yueming was fast.
After all, there are only so many hardware parts needed for each transformation.
Most of them, Li Yueming, have procurement experience before.
The control of prices is naturally not the same as when there was no experience before
It took more than half a day for Li Yueming to understand Suzhou, the largest hardware city.
With extraordinary memory.
Li Yueming comprehensively compared the length between several favorite merchants.
In the end, all the hardware needed for this transformation was purchased at a price of 100,000 yuan.
This price is more expensive than the previous two prices.
But there’s no way around it.
In fact, according to the normal situation, Li Yueming estimates that he only needs to spend less than half of his budget to purchase hardware.
After all, Mr. Wu’s house is different from the client’s home that was renovated two times earlier.
There are many hardware pieces in Mr. Wu’s house that are still in good condition and can be reused.
But this time is clearly not normal.
Li Yueming needs to install a floor heating system, and is also ready to install an air purifier, as well as a lot of smart furniture.
Therefore, it must require a lot more lines than ordinary houses.
Not only are the lines more expensive, but the material quality requirements required are also higher.
Of the 100,000 yuan hardware budget, Li Yueming spent 70,000 yuan on water pipes and wires alone.
Other bits and pieces have not yet been counted.
Today is the fifth day of the official start of the fourth round of transformation.
On the other side of the construction site, construction began this morning.
All the patterns in Mr. Wu’s house need to be disassembled and reinstalled, so Li Yueming is not afraid that the workers have nothing to do.
Put the purchased hardware into the warehouse.
Li Yueming rushed to the next stop without stopping.
Since it was procurement, Li Yueming was ready to concentrate on completing all procurement in these few days.
With the rest of the time, Li Yueming himself still has a lot of things to do.
Near dusk, Li Yueming took a group of people from the program group to the largest local home appliance city in Suzhou.
The problem with hardware is actually nothing.
Next, the procurement of furniture and electrical appliances is Li Yueming’s biggest headache.
Because this time the construction drawings Li Yueming are close to the relatively advanced modern design.
Therefore, the requirements for all kinds of furniture and electrical appliances are relatively high.
The budget of more than 200,000 is not much, but it is actually not less.
Li Yueming was naturally ready to use it all on the blade that was most needed.
……